top of page

AKU Hospital, Kampala

BZC conducted an independent HVAC peer review for a 101-bed tertiary hospital, strengthening resilience, infection control, and energy performance while aligning the design with global healthcare and ventilation standards.

•N+1 chiller redundancy
•Reduced capex & opex via simplified pumping
• ASHRAE 170-2021 compliant ventilation
• Improved IAQ for infection control
•Climate-appropriate HVAC design
•Structured IBMS training introduced

Independent HVAC peer review, healthcare ventilation compliance review (ASHRAE 170-2021), system resilience and redundancy evaluation, energy optimisation advisory, and IBMS training and maintenance strategy development.

Power in Numbers

Programs

Locations

Volunteers

© Building Zero Consultants. All Rights Reserved.

HOW GREEN company_17524_edited.png
bottom of page