top of page

AKU Hospital, Kampala
BZC conducted an independent HVAC peer review for a 101-bed tertiary hospital, strengthening resilience, infection control, and energy performance while aligning the design with global healthcare and ventilation standards.
•N+1 chiller redundancy
•Reduced capex & opex via simplified pumping
• ASHRAE 170-2021 compliant ventilation
• Improved IAQ for infection control
•Climate-appropriate HVAC design
•Structured IBMS training introduced
Independent HVAC peer review, healthcare ventilation compliance review (ASHRAE 170-2021), system resilience and redundancy evaluation, energy optimisation advisory, and IBMS training and maintenance strategy development.
Power in Numbers
Programs
Locations
Volunteers
bottom of page
